Before Quotation
Provide the complete NMFC03 model, quantity, destination, original label photographs, installed-system details, application, requested certificates, delivery deadline and inspection requirements before quotation.
Stock Verification
Stock verified: 2026-11-13. Warehouse staff verify 2 available units, the complete label, connectors, included hardware, packaging condition and visible appearance before confirming stock.
Order Confirmation
The quotation records the complete model, quantity, condition, price, warranty, payment term (T/T), lead time normally 1-3 working days after payment, delivery route, destination and agreed inspection scope.
Inspection and Testing
Identification, enclosure or board, connectors, included hardware and visible condition for NMFC03 are inspected. Continuity, power-on or functional testing is documented only when feasible and agreed.
Packaging
The product is protected with anti-static or moisture-resistant materials, connector protection, cushioning and a suitable export carton selected for the item and delivery method.
International Shipping
Delivery ways: DHL / FEDEX / UPS / TNT. Route, tracking, destination taxes, customs responsibility and buyer-specified delivery terms are confirmed before dispatch. Shipment documents are recorded.
After-Sales Support
Retain the label, packaging, inspection records and order documents. Report any model mismatch, missing accessory or transit damage promptly with clear photographs and shipment details.