Before Quotation
Provide the complete DSQC562 3HAC16014-1 marking, required quantity, destination, host equipment, label photographs and inspection requirements before quotation.
Stock Verification
Stock verified: 2026-11-19. Warehouse staff verify the listed 7 units, complete model label, connectors, visible condition and packaging before confirming availability.
Order Confirmation
The quotation records the complete model, quantity, condition, price, warranty, delivery route, destination and agreed inspection scope before payment is arranged.
Payment and Lead Time
Payment terms and confirmed lead time are stated in the written quotation. Dispatch timing starts only after payment and order details are confirmed.
Inspection and Testing
Identification, original label, housing or board condition, connectors and visible condition are inspected. Only agreed feasible checks are documented within the confirmed test scope.
Packaging
The serial measurement unit is protected with anti-static and moisture-resistant materials, connector protection, cushioning and a rigid export carton selected for the item and delivery route.
International Shipping
Delivery may use DHL, FEDEX, UPS or TNT. Tracking, destination taxes, customs responsibility and buyer-specified delivery terms are confirmed before dispatch.
After-Sales Support
Retain the label, packaging, inspection record and order documents. Report any model mismatch, missing item or transit damage promptly with clear photographs and shipment details.