Before Quotation
Provide the complete GJR4500400R1 35NE90 marking, required quantity, destination, installed-system details, label photographs and inspection requirements before quotation.
Stock Verification
Stock verified: 2026-11-23. Warehouse staff verify the listed 1 units, complete identifiers, original label, connectors, visible condition and packaging before confirming availability.
Order Confirmation
The quotation records the complete model, quantity, condition, price, warranty, payment term, confirmed lead time, delivery route, destination and agreed inspection scope before payment is arranged.
Inspection and Testing
The complete label, enclosure, mains terminals, output and backplane connectors, indicator windows, cooling openings and visible condition are inspected. Any insulation, power-on or load test is performed only under an agreed scope.
Packaging
The power supply module is protected with anti-static and moisture-resistant materials, connector protection, cushioning and a rigid export carton selected for the item and delivery route.
International Shipping
Delivery ways: DHL / FEDEX / UPS / TNT. The confirmed lead time, tracking, destination taxes, customs responsibility and buyer-specified delivery terms are recorded before dispatch.
After-Sales Support
Retain the label, packaging, inspection record and order documents. Report any model mismatch, missing item or transit damage promptly with clear photographs and shipment details. Payment term: T/T. Lead time is normally 1-3 working days after payment, subject to final stock confirmation.